Transaction Advisory & Financial Consulting Projects

Services include feasibility studies/Procurement Planning, financial advice, modeling and structuring for implementation of project to be undertaken on BOT (TOLL/BOT) annuity basis. CMC is working with client in producing a financially viable concession that would address the principal issues related to the project risks and adequate return to the concessionaire. CMC approach to the project formulation and preparation comprises of five stages i.e. PHYSICAL PACKAGING, STRATEGIC PACKAGING, INVESTMENT PACKAGING, PROCESS PACKAGING, DELIVERY SYSTEM PACKAGING .These include review of DPR / Feasibilities Study Report prepared by consultants , project cost optimization , review of overall viability of the project packaging as envisaged by the Technical Consultants , review of traffic studies and demand forecasting , revenue forecasting , critical review of willingness to pay toll , review of toll rate determined , review & development of tolling strategy to minimize traffic leakage , detailed due diligence on the various risk involved in the toll road development including the land acquisition risk, construction risk, revenue risk.

Projects Completed/underway:

  • Financial Consultant for 4 / 6 laning of Rewari to Ateli Mandi of NH – 11 from Km 13to Km 44 = 31 Kms in the state of Haryana under Bharatmala Pariyojana in Hybrid Annuity Mode
  • Financial Consultant for Rehabilitation and augmentation of New NH – 354 (old SH – 325) of section Ramdas to Gurdaspur from Design Chainage Km 140.000 (existing km 46.320 of SH ) to Design Chainage Km 187.492 (existing km 3.185 of SH) for Length 47.492 km into Two with paved shoulder / Four lane under Bharatmala scheme in the state of Punjab on EPC Mode
  • Financial Consultant for Four Laning Challakere to Hitiyur Bypasses from Km. 359.100 to Km 413.200 (Design Chainage km 358.500 to Km 414.215)
  • Financial Consultant for Up – gradation of NH configuration under Bharatmala Projects from Jaisamler (NH – 11) – Bhadasar – Ramgarh Tanot and Bhadasar – Sarkaritala upto Pakistan Border (Package – 5) in the State of Rajasthan.
  • Financial Consultant for Rehabilitation and Upgradation of stretch of Giddalur, Cumbum, Thokapalli, Vinukonda, Narasaraopet and terminating at its junction with NH – 16 at Guntur (Km 212.983 to Km 322.800) to 2 lane with paved shoulder in the state of Andhra Pradesh on Hybrid Annuity Mode
  • Financial Consultant for Four Laning from Vikupuram (Km 0/0) – Pudherry – Nagapattinam (km 194 / 000) section of NH – 45 A in the state of Tamil Nadu under NHDP Phase – IV (4 packages ) – Package – IV four laning of Sattanathapuram (Ch : 123.800) to Nagapattinam (Ch : 180.620) section of NH – 45 A in the state of Tamil Nadu under NHDP Phase – IV
  • Financial Consultant for 4 lane with paved shoulder configuration of Nagpur Umred section of NH 353 D (Package 1 A Km 7/300 to Km 54/385) in the state of Maharashtra on EPC Mode
  • Financial Consultant for 2 laning with paved shoulders from Km. 94.000 to Km. 174.000 (Design Chainage from Km. 94.000 to Km. 174.000) of Karikudi – Ramanathapuram section of NH – 210 including 500 m on SH 35 – Madhrai Road (near Devakottai Rasta Railway Section) in the state of Tamil Ndu on EPC mode. [Total Design Length : 80.000 Km] under NHDP – III
  • Financial Consultant for 4 laning of the section from Gundugolanu – Kovvuru of SH – 107 (Approx. Length 70 Km) (realigned section of NH – 5 in the state of Andhra Pradesh
  • Financial Consultant for Four Laning of Takoli to Kullu Section of NH – 21 (Km. 242+000) to Km (272+000) under NHDP Phase – IV B on EPC Mode in the state of Himachal Pradesh.
  • Financial Consultant for Four / Six laning of Kagavadar to Una Section of NH – 8 E from Km 139.915 to km 180.478 (design chainage from 140.470 to km 181.450) Package – IV in the state of Gujarat to be executed as BOT (Annuity) Hybrid basis on DBFOT pattern under NHDP Phase – IV
  • Financial Consultant for Four Laning of Aunta – Simaria (Ganga Bridge with approach road) section of NH 31 from Km 197.900 to Km 206.050 (Design Chainage) and Existing Chainage from Km 204.741 to Km 209.945 of NH – 31 in the state of Bihar on Hybrid Annuity Mode
  • Financial Consultant for Rehabilitation and Up – gradation of Maheshkhunt – Saharsa – Purnea section of NH – 107 in the state of Bihar under Phase – IV B on EPC Mode Package1
  • Financial Consultant for Rehabilitation and Up – gradation of Maheshkhunt – Saharsa – Purnea section of NH – 107 in the state of Bihar under Phase – IV B on EPC Mode PackageII
  • Financial Consultant for 4-laning of Meerut to Bulandshahar section from km 7469 to km 66+482 of NH – 235 in the State of Uttar Pradesh under NHDP Phase IV B on Hybrid Annuity Mode
  • Financial Consultant for 4 Laning of Lucknow – Sultanpur section of NH – 56 from Km 11.500 to Km 134.700 on the state of Uttar Pradesh on Hybrid Annuity Mode
  • Financial Consultant for Development of newly declared NH – 527 C from Majholi to Charout section to 2 lane / 4 lane National Highway Standard in the state of Bihar
  • Financial Consultancy and Transaction Advisory Services for Development of Multipurpose Cargo Terminal at Mormugao Port Trust, Goa on DBFOT Basis
  • Financial Consultant for Two Laning with paved shoulders from Km. 1.600 to Km 80.00 (Design Chainage from Km. 1.60 to Km 80.133) of Nagapattinam – Thanjavur section of NH – 67 (Total Design Length – 78.533 Km)) under NHDP Phase – III on EPC mode in the state of TamilNadu
  • Financial Consultant for Four Laning of Gomati Chauraha Udaipur section of NH – 8 from Km 177.000 to Km 260.100 in the State of Rajasthan under NHDP Phase IV.
  • Financial Consultancy and Prebid Advisory for Four Laning of Haryana / Punjab border –jind section of NH – 71 from Km 239.00 to Km 307.0 under BOT (Toll) basis on DBFOT Basis (PPP Project)
  • Financial / Technical Consultant for Lalitpur-Sagar- Lakhnadone Section of NH – 7 OMT – 14 (NS)
  • Financial /  Technical Consultant for       Madurai – Tirunelveli – Panagudi – Kannya kumari Section (Km 0.00 to Km 240.40) of NH – 7 – OMT – 6(NS)
  • Financial Management and Procurement Support Consultancy Services to SPMU under Coastal Zone Management Project in Gujarat.
  • Financial Consultants Services for 24 Border Check Posts across the state on BOT basis on Design, Built, Finance, Operate & Transfer (DBFOT)model
  • Financial Consultant for Hyderabad – Bangalore section ( km 211.00 to km 463.00) of NH– 7
  • Financial Consultant for Ayodhya – Gorakhpur Section (km 135.00 to km 251.7) of NH – 28
  • Financial Consultant for Kanpur – Lucknow (km 11.05 to km 75.50) stretch of NH – 25, Lucknow Bypass (km 0.00 to km 22.85) stretch of NH – 56 and Lucknow – Anyodhya Section(km 8.0 to km 137) stretch of NH – 28
  • Financial Consultant for Chattisgarh / Orissa – Aurang section from km 88/000 to km 239/000 of NH – 239 in the State of Chhattisgarh
  • Financial Consultant for Etawah to Chakeri (Kanpur) section of NH – 2 from km 323.475 to km 483.687 in the State of Uttar Pradesh under NHDP Phase V on DBFOT Basis
  • Financial Consultant for Kozhikode Kollegal Section of NH – 212 from Kerala Border to Kollegal
  • Financial Consultant for Four Laning of Beawar-Pali- Pindwara section of NH – 14 in the state of Rajasthan under NHDP Phase – II on DBFOT Toll Basis.
  • Financial Consultant for Four laning of Patiala- Sangrur-Bhatings section of NH – 64 from km 50.700 to 209.500 in the State of Punjab through Public Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
  • Financial Consultant for Four Laning of Zirakpur – Patiala Section of NH-64 from Km 0.000 to Km 50.700 in the State of Punjab through Public- Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
  • Legal Advisor for Four Laning of Zirakpur  – Patiala Section of NH-64 from Km 0.000 to Km 50.700 in the State of Punjab through Public- Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
  • Financial Consultant for Chitradurga-Shimoga Section of NH-13 in the state of Karnataka
  • Financial Consultant for 2 laning of paved shoulder of Mokama- Munger section of NH –80 from km. 1.430 to km 70.00 in the State of Bihar
  • Financial Consultant for 4 laning of Jammu – Udhampur of NH-1A on BOT (Annuity) project on DBFO Pattern under NHDP Phase –II
  • Financial Consultant for 4 laning of Chenani – Nashri of NH-1A on BOT (Annuity) project on DBFO Pattern under NHDP Phase –II
  • Financial Consultant for 4 laning of Talegaon – Amravati of NH-6 on BOT project on DBFOT Pattern under NHDP Phase–III
  • Financial Consultant for 6 laning of Belgaum – Dharwad of NH-4 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –V
  • Financial Consultant for 6 laning of Indore – Dewas of NH-3 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –V
  • Financial Consultant for 6 laning of Varanasi- Aurangabad of NH-2 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –V
  • Financial Consultant for 4 laning of Goa – Karnataka Border to Panaji – Goa of NH-4A on BOT project on DBFOT Pattern under NHDP Phase–III
  • Financial Consultant for 4 laning of Cherthalai – Ochira of NH-47 on BOT project on DBFOT Pattern under NHDP Phase–III
  • Financial Consultant for 4 laning of Kuttipuram –Edapally of NH-17on BOT project on DBFOT Pattern under NHDP Phase –III
  • Financial Consultant for 4 laning of Ochira – Thiruvananathapuram of NH-47 on BOT project on DBFOT Pattern under NHDP Phase –III
  • Financial Consultant for 4 laning of Nagapatnam – Thanjavur of NH-67 on BOT project on DBFOT Pattern under NHDP Phase –III
  • Financial Consultant for Four Laning of PATNA – BAKHTIYARPUR section of NH- 30 in the state of Bihar on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III.
  • Financial Consultant for 4-laning of Bareilly- Sitapur Section of NH-24 in the State of Uttar Pradesh on DBFOT basis under NHDP – III
  • Financial Consultant for Four/ Six Laning of GANDHIDHAM (KANDLA) – MUNDRA section of NH – 8A in the state of Gujarat on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III – BOT (Toll) basis.
  • Financial Consultant for 4-laning of Rohtak- Panipat Section of NH-71A in the State of Haryana on DBFOT basis under NHDP – III
  • Financial Consultant for Six Laning of TUMKUR- CHITRADURGA section of NH – 4 in the state of Karnataka on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-V
  • Financial Consultant service for Construction of 6- Lane access controlled Greenfield highway from km 60+000 to km 90+000 of Rasisar- Deogarh section of NH 754K as part of Amritsar Jamnagar Economic Corridor in the state of Rajsthan of EPC mode under Bharatmala Pariyojna.(AJ/RD-PKG-3)
  • Financial Consultant service for Construction of 6- Lane access controlled Greenfield highway from km 90+000 to km 120+000 of Rasisar- Deogarh section of NH 754K as part of Amritsar Jamnagar Economic Corridor in the state of Rajasthan of EPC mode under Bharatmala Pariyojna..(AJ/RD-PKG-4)
  • Financial Consultant service for Construction of Eight lane carriageway starting from junction with NH- 248A near Dhuneja village and ending before junction with KMP expressway (Km 0+000 to Km 18+500) section of Delhi- Vadodara Green field Alignment (NH 148 N) on EPC mode under Baharatmala Pariyojna in the state of Haryana
  • Financial Consultant service for Construction of Flyover at Km 77.750 of Hinghanghat- Nandgaon junction of NH 44in the state of Maharashtra on EPC Project.
  • Financial Consultant service for 4-lanning of NH-709B from EPE crossing (existing chainage 30.790, design chaingae 0.000) to start of shamli bypass (existing change 92.200, design change 61.490) on EPC mode under bhartmala pariyojana in the state of Uttar Pradesh.
  • Financial Consultant for Six Laning of Chennai ORR to Chinnaiyan Chathiram Section of NH-48 (Old NH-4 ) from Km. 22.800 to Km 59.800 in the state of Tamil Nadu under NHDP Phase -V on Hybrid Annuity Mode (Package -1)
  • Financial Consultant for 4 lane with paved shoulder configuration of Nagpur Umred section of NH 353 D (Package 1 A Km 7/300 to Km 54/385 ) in the state of Maharashtra on EPC Mode
  • Financial Consultant for Construction of Balance work of Six Lane jaipur Ring Road (NEW NH ) Project from Agra Road junction to Ajmer Road junction on EPC Mode
  • Financial Consultant for Construction of structures as part of jaipur Ring Road (New NH ) Project from Agra Read junction to Ajmer Road junction on EPC Mode
  • Financial Consultant For Rehabilitaion and up-gradation of NH – 66 (Erstwhile NH – 17 ) from Km. 406/330 to Km 450/170 (Kalmath to Zarap section ) to Four lane with paved shoulder in the state of Maharashtra under NHDP Phase IV on Hybrid Annuity
  • Financial Consultant for Construction of 4 Lane Lucknow Ring Road in the State of Uttar Pradesh under NHDP Phase – VII on Hybrid Annuity Mode
  • Financial Consultant for Construction of 2 lane with paved shoulder of Varanasi to Dagamapur section of NH – 7 in the state of uttar pradesh
  • Financial Consultant for 6/8 laning of existing 4 lane NH -3 from Ch.539.500 (Vadape ) to CH.563.00 (Thane ) NH -3 to be executed as BOT (toll) Project Pattern
  • Financial Consultant for Two laning with paved shoulder of Chas – Ramgarh section of NH -23 from Km. 0.00 to Km. 78.192 in the state jharkhand under NHDP Phase -IV on ECP Mode
  • Technical and Financial Consultant for Operation & Maintenance of Chandikhole – Paradip section of NH – 5 A from Km 00.000 to km 76.588 under OMT Project Pkg – 33 basis in the state of Odisha
  • Financial Consultant for Evaluation of RFAQ – 2015 OMT
  • Financial Consultant to Evaluate RFAQ 2014
  • Financial Consultant for 4 laning of Bellary Bypass (Design Ch. 333 + 060 ) to Karnataka /Ap Border in the state of karnataka on EPC Mode
  • Financial Consultant for 4 lane highway connecting km 17.3 of NH – 37 A and km 182 of NH – 52 between Dolabari and jamuguri on BOT (Annuity Basis )
  • Financial Consultant for 4 laning of NH – 37 A from Km 0.00 (Kaliabor Tiniali road junction ) to Km 17.300 (Dolabari Road Junction)
  • Financial Consultant for 4 laning from 278.600 (end of Nagaon Bypass) to Km 315.315 (Kaliabor Tinali ) of NH – 37
  • Financial Consultant for 4 laning of Udhampur to Ramban from Km. 67.00 to Km 89.00 and Km 130.00 to Km 151.00 of NH – 1 A (now NH -44 ) on EPC Mode in the state of jammu & Kashmir on NHDP Phase -II
  • Financial Consultant for lanning of Ramban to Banihal section from Km. 151.000 to Km 187.000 of Nh – 1 A EPC Mode in the state of jammu & Kashmir
  • Financial Consultant for Construction of 2 Lane Alappuzha Bypass on NH – 47 in the state of Kerala
  • Financial Consultant for Raipur Bheem jassa Khera section PKG-III of NH – 458 to two lane with paved shoulders through an Engineering Procurement and Construction Contract.
  • Financial Consultant for Two laning with paved shoulder of jhalawar -MP / Rajasthan Border section of NH -12 (from Km. 346.540 to Km 412.000 of NH -12 ) in the state of Rajasthan to be excuted on EPC Contract under NHDP IV B
  • Financial Consultant for 2 Laning of paved shoulder of Nagapatnam – Thanjavur in the state of Tamil Nadu under NHDP PHASE -III ON DFBOT Basis
  • Financial Consultancy and Prebid Advisory for Four Laning of Satna – Bela Section of NH – 75 under BOT (Toll) on DBFOT Basis
  • Financial Consultant for Six / Four /2 Lane with paved shoulder of Bhavnagar – Pipavav – Porbandar – Dwarka section of NH – 8 E in the state of Gujarat (approx length 445 Km)
  • Technical & Financial Assistance in finalisation of PPPAC Proposal and assistance of PPPAC Proposals
  • Financial Cosultant for Bareily – Sitarganj section of NH -74 section of NH – 56 for NHDP Phase -IV B & IV A in the state of Uttar Pradesh on PPP (DBFOT) Pattern
  • Financial Consultant for Lucknow -Sultanpur – Varanasi section of NH – 56 for NHDP Phase – IV B & IV A in the state of Uttar Pradesh on PPP (DBFOT) Pattern
  • Financial Consultant for Moradabad – Aligarh of NH -93 in the state of Uttar Pradesh under NHDP Phase IV B on DBFOT Basis
  • Financial Consultant for 4-laning of Meerut to Bulandshahar section from km 7469 to km 66+482 of NH -235 in the state of Uttar pradesh under NHDP Phase IV B on DBFOT Basis
  • Varanasi to Gorakhpur Section of NH – 29 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis
  • Kanpur to Kabrai Section of NH – 86 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis
  • Kollam to Kazhuthurutty Section of NH – 208 in the state of Kerala of two lane with paved shoulders through “PPP” on DBFOT basis
  • Agra to Aligarah Section of NH – 93 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis.
  • Raebareilly to Allahbad Section of NH – 24B in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis.
  • Aligarh to Kanpur section of NH – 91 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis.
  • Kozhikode to Muthanga Section of NH – 212 in the state of Kerala of two lane with paved shoulders through “PPP” on DBFOT Pattern.
  • Chitradurga-Shimoga Section of NH-13 in the state of Karnataka
  • Financial Consultant for 4 laning of Udampur – Ramban of NH-1 on BOT (Annuity) project on DBFO Pattern under NHDP Phase-II
  • Financial Consultant for 4 laning of Banihal – Ramban of NH-1 on BOT (Annuity) project on DBFO Pattern under NHDP Phase-II