Projects Completed/underway:
- Jhansi-Khajuraho section (Package-II) of NH-75/76 from Design Chainage Km. 76.3 (Existing Chainage 82.100) near village Chhatipahari to Design Chainage Km. 161.7 (Existing Chainage Km. 57.9) near Bamitha town in the State of Uttar Pradesh & Madhya Pradesh under NHDP (Phase III) on Hybrid Annuity Mode
- “Consultancy Services for Safety audit of Project Jhansi-Khajuraho section (Package-I) from km 0.00 to km 76.3 (existing km 108.300 of NH-25 Kanpur- Jhansi Section to km 82.10) of NH-75/76 in the state of UP/MP under NHDP Phase-III on Hybrid Annuity Mode
- Safety Consultant Services for Development, Operation and Maintenance of the Gadoj (State Border) –Majri to Haryana/Rajasthan Border and Majri to Neemrana (SH-111 & SH-111A) Highway Project through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis in State of Rajasthan.
- Four laning of Jaipur Reengus Section of NH – 11 from Km. 246.300 to 298.075 in the state of Rajasthan on DBFOT pattern under NHDP Phase-III. Design length 51.842.
- Nagpur – Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) In The State of Maharashtra on Epc Mode For Package 04, From Km. 162.667 To Km. 217.023, (Section – Village Donad Bk. To Village Januna Kh.) In District Washim.
- Consultancy Services for For 4-laning of Meerut- Bulandshahar section of NH-235 (New NH-334) from km. 8.800 to km 66.482 (Design Chainage Km. 73.512) in the State of Uttar Pradesh under NHDP Phase-IV on Hybrid Annuity DBOT Mode
- Rehabilitation/Upgradation of existing Highway to 2 Lane/4 Lane with paved shoulder configuration from Latur to Pangaon (Ch.Km.64+250 to Km.106+200) section of NH-548B & 361H on EPC Mode in the state of Maharastra”
- Rehabilitation / Upgradation of existing Highway to 2 Lane / 4 lane with paved shoulder configuration form Kundral to Wazar ( Ch. Km 52+730 to 99+250 ) section of NH-161A on EPC Mode in the state of Maharashtra ( Total Length Km 46.520)
- Construction of Flyover and Underpass with Service Roads at Atul Kataria Chowk on Old Delhi – Jaipur Road in Gurugram in the State of Haryana
- Safety Consultant for Construction of 2-lane ROB ( Rail Over Bridge) and its approaches in lieu of existing Level Crossing ( L.C No. 39-B) at Km Km.158 on NH- 74 including Railway Portion at Kashipur in the State of Uttarakhand on EPC mode. (Design Stage)
- Construction of 630m long bridge over river Yamuna along with river training guide bund works on Faridabad – Greater Noida road in the state of Haryana on EPC Mode under ISC Scheme of CRF (Design Stage).
- Four / Six laning of Gandhidham (Kandla – Mundra) port section of NH-8A (extn.) (Approximate length of 71.400 kms) in the state of Gujarat under NHDP Phase – III through PPP on DBFOT Basis
- Safety Consultant for 6-laning of Handia-Varanasi section of NH-2 from km 713.146 to km 785.544 in the State of Uttar Pradesh under NHDP Phase-V on Hybrid Annuity Mode
- Safety Consultant for Construction of Elevated Corridor Highway from Samrala Chowk at Km 76+000 to Km 85+980 of NH – 95 (Section passing through Ludhiana city) in the state of Punjab
- Safety Consultant Services for O & M Stage of NHAI – O & M Phase of 4 lanes Bhubaneswar (Km. 435.495) – Ichhapuram (Km. 620.430) section of NH – 16 in the state of Odisha (Length – 185.00 Km )
- Safety Consultant for 6 laning of Kamrej – Chalthan section of NH – 8 from Km. 248.100 to Km. 264.350 including long term remedial measures for 4 black spots in Kamrej – Bharuch section of NH – 8 in the state of Gujarat on EPC Mode under NHDP Phase V
- Safety Consultant for 6 laning of Samaikhiali to Ghandidham section of NH – 8 A from km. 306.000 to Km. 362.160 in the state of Gujarat under NHDP Phase – III through PPP on DBFOT basis
- Safety Consultant for Four Laning of Gujarat / Maharashtra Border – Surat – Hazira Port section of NH – 6 (Approx. Length 131.5 km) in the state of Gujarat under NHDP Phase – III (Total Length : 131.50 Km)
- Safety Consultant for Four Laning of Godhra – Gujarat / Madhya Pradesh Border section of NH – 59 from Km 129.900 in the state of Gujarat on DBFOT basis (Total Length : 118.22 KM)
- Safety Consultant for Construction of Flyover & Underpass at Hero Honda Chowk, Gurgaon Jan’ 2016
- Safety Consultant for Four laning of Ahmedabad- Godhra section of Nh-59 from km 200 to km 122.420 in the state of Gujarat on DBFOT basis under NHDP Phase-III(Package-I) and Transfer (DBFOT) Basis
- Safety Consultant for Kanpur Lucknow section (km 11+ 005 to km 75+ 500) stretch of NH – 25 and Lucknow Bypass (km 0.000 to km 22.850) Stretch of NH – 56 A, & NH – 56 B and Lucknow Ayodhya section (Km 8+000) to km 137 +970) Stretch of NH – 28 n the state of Uttar Pradesh . Jul’ 2015

